The Atlanta Streetcar: 2.7 miles and 12 stops downtown

A stop-by-stop look at Atlanta's downtown streetcar loop: how it was built, who runs it now, what it costs to ride, and the sites it passes.

You can ride Atlanta's streetcar from one end to the other in less time than most people spend hunting for a parking space downtown. The loop runs 2.7 miles and makes 12 stops, from the edge of Centennial Olympic Park out to the Martin Luther King Jr. Historic District on Auburn Avenue and back again. It took its first public passengers on December 30, 2014, and it has been a low-voiced argument ever since over what a small piece of rail can and cannot do for a big city.

The twelve stops, in order

Start with the list, because the loop is easier to hold in your head that way. The stops, as the system publishes them:

  1. Centennial Olympic Park
  2. Carnegie at Spring
  3. Luckie at Cone
  4. Peachtree Center
  5. Woodruff Park
  6. Park Place
  7. Hurt Park
  8. Auburn at Piedmont
  9. Sweet Auburn Market
  10. Dobbs Plaza
  11. Edgewood at Hilliard
  12. King Historic District

Two of them earn their keep as connections. Peachtree Center is the transfer to MARTA rail, which means a rider coming in on the north-south line can step onto the streetcar without going back up to street level and walking blocks in the weather. At the other end, the Centennial Olympic Park stop sets you down beside the Georgia Aquarium and the World of Coca-Cola, the part of Downtown visitors are most likely to be hunting for.

The eastern half of the loop is where the history lives. The Sweet Auburn Market stop sits on the avenue that was the center of Black business and church life in the early twentieth century, and the King Historic District stop is at the National Park Service site that takes in the King birth home and Ebenezer Baptist Church. For the whole story of that avenue, see Sweet Auburn: Black commerce in the age of Jim Crow and Sweet Auburn.

An old idea in a new loop

Atlanta has been down this track before. Electric streetcars arrived in 1889, and the lines they opened made the "streetcar suburbs" that still shape the map. Inman Park, the city's first planned suburb, came first; Kirkwood and Candler Park grew up later along lines that ran out from the center. The streetcar suburbs of the 1890s: a map of Atlanta's eastside neighborhoods tells that story. The modern loop does something else entirely. The old lines carried commuters outward from Downtown, while the new one circles inside it, so its job is closer to a slow, dependable shuttle between places that already exist.

That difference explains a good deal of the grumbling. A line that serves suburbs creates its own demand by opening up land. A downtown circulator can only move people who are already there, and it gets judged on a plainer question: do the park, the office district, the campus edge and the Auburn corridor feel any closer together than they did before?

A ride, stop by stop

Begin at Centennial Olympic Park, the western end of the loop. The park was built for the 1996 Summer Games and anchors the attractions district. Carnegie at Spring and Luckie at Cone are named for the street corners they sit on, and they carry the line through the office and hotel core, where the streets cross at short intervals. Peachtree Center, again, is the transfer to rail.

From there the line rolls on to Woodruff Park, the green patch in the middle of Downtown named for the Coca-Cola leader who gave the city so many of its institutions. Then come Park Place and Hurt Park, which sit at the edge of the Georgia State University campus, the school whose first MARTA stop anchored the east-west line when rail opened in 1979. Auburn at Piedmont is the first stop named for the avenue, with Sweet Auburn Market and Dobbs Plaza right behind it. Edgewood at Hilliard marks the Edgewood Avenue side of the loop, and the King Historic District stop, at the national park's historic district, holds down the eastern end.

Because it is a circuit, there is no wrong direction. Board at Peachtree Center, want the King site, and you will get there either way. The only question is whether to take the short way around.

How the loop got built

It was not a quick job. The federal government gave Phase I $47 million in 2010 through the TIGER II grant program, and in 2012 the city raised its own budget for the work from $70 million to $90 million. A manufacturer won a $17.2 million contract in 2011 for four streetcar vehicles. Groundbreaking came on February 1, 2012. The opening date slid more than once: first May 2013, then summer 2014, and finally the last days of December 2014. When it was done, the initial loop had cost $98 million, nearly $30 million above the original projection.

The nonprofit that pushed the idea, Atlanta Streetcar, Inc., was founded in 2003 as an advocacy group. Running a system turned out to be harder than lobbying for one, and by June 2018 MARTA had agreed to take over control and ownership. Operations moved to MARTA's light rail office on July 1, 2018.

Riding was free until January 1, 2016, when a fare began.

What it costs to ride

As of November 2026, MARTA's fares page lists a Streetcar fare of $1.00 per ride, with no transfers. The regular MARTA fare is $2.50 as of 2026, so the streetcar is the cheaper trip. But it carries no transfers, unlike the rail and bus fare, which comes with up to four free transfers in three hours when you use the same payment method for each leg.

MARTA's fares page also lists a Streetcar 1-day pass at $3.00 as of November 2026, along with trip passes whose terms are spelled out on that page. Do the arithmetic once. At $1.00 a ride, the 1-day pass beats single fares from the fourth ride on ($3.00 for the day against $4.00 in singles). The whole loop is a dozen stops, so a visitor going out to the King park and back uses two rides, and the day pass pays off only for somebody planning to hop on and off for a few hours.

Payment changed in 2026 with MARTA's move to the Better Breeze system, where a rider taps a credit or debit card, phone or watch at the reader. The details are in Better Breeze: the fare system that replaced the Breeze card and the how-to is in How to pay for MARTA with Better Breeze.

How many people ride it

Not many, compared with MARTA's rail and bus, and there is no use pretending otherwise. According to the American Public Transportation Association's quarterly reports, the streetcar logged about 218,500 annual rides in 2025 and averaged about 600 weekday riders in the second quarter of 2026. MARTA's whole rapid transit system, for comparison, recorded about 65.8 million rides in 2025 and roughly 258,700 weekday boardings in the second quarter of 2026. Set side by side, the streetcar carries a fraction of one percent of what the larger system does.

Those numbers are the middle of the debate. Supporters say the streetcar was always meant as a connector for people already downtown, and that it does what a short circulator ought to do: tie together the park, the office core, Georgia State's campus edge and the historic district without a car. Critics point to the cost per rider and note that a loop on city streets shares lanes with traffic and travels no faster than a bus. Both can be true, and the ridership figures do not settle which of them matters more.

The extension that did not happen

The loop was supposed to be the first piece of something bigger. In 2018 MARTA's board approved $570 million for a streetcar on 15 miles of the BeltLine, and a planned East Extension would have run about two miles east along Edgewood Avenue, Randolph Street and Auburn Avenue, then north along the BeltLine toward Ponce City Market, with five new stations. Voters had approved a half-cent sales tax for the "More MARTA" program in November 2016, and $66 million of that money was set aside for BeltLine right-of-way (see The 2017 sales tax rise that funded Atlanta's MARTA share for how that tax got started).

In March 2024 the East Extension carried an estimate of $200 million, with construction forecast for 2025. A year later, in March 2025, the mayor pulled support for it and reprioritized a streetcar extension into the Southside corridor instead. So the streetcar network as it stands in November 2026 is the original loop and nothing more, and the next piece of MARTA's surface transit work is bus-based: the Cleveland-Metropolitan arterial rapid transit project, which began construction in October 2026 and is covered in The Cleveland-Metropolitan arterial rapid transit line begins construction.

Riding it with a purpose

The sensible way to use the loop is as a one-seat link between three things that are awkward to connect on foot.

  • From Peachtree Center to the King park. The walk is real, and miserable in July heat. The ride is a few stops.
  • From the park-and-attractions end to the Auburn corridor. A family at the aquarium in the morning and the King site in the afternoon can chain the two without a car.
  • To the edge of the Old Fourth Ward. The Edgewood at Hilliard stop is close to the part of the east side that Old Fourth Ward describes, where the BeltLine's Eastside Trail begins.

Check MARTA's streetcar route information and its service alerts before you go. Advisories and operating hours are posted at itsmarta.com and they change.