Guides
How to get a building permit in Atlanta
Permits run through the Department of City Planning's Office of Buildings, with zoning checked first and NPU notice in some districts. Steps and tree rules.
In Atlanta, a permit is how the city makes sure that what gets built, changed or cut down is safe and legal under the building code and the zoning ordinance. The office that issues them is the Department of City Planning, and the people who actually look at the plans sit in its Office of Buildings at City Hall, 55 Trinity Avenue SW. Getting through the process is easier if you separate three questions that sound alike: what the zoning allows, what the building code requires, and what you are allowed to remove from the property.
This guide gives the shape of the process, not fees. The department's pages hold current fee schedules, forms and contact lines.
Who does what
The Department of City Planning has several parts that homeowners and builders meet:
- The Office of Zoning and Development handles zoning compliance, which means whether a use or a building fits the zoning district a property sits in.
- The Office of Buildings reviews permit applications for building, signs and tree removal and runs inspections and code enforcement.
- Housing policy is also in the department.
The city's permit pages for zoning, development and permitting services explain how to get started, and Department of City Planning and building permits describes the department in more detail.
Step 1: Check the zoning first
Before you spend money on drawings, find out the zoning district of the property and what it allows. Zoning controls the uses permitted, the height and size of buildings, how far they sit from the lot lines and how much of a lot they can cover. A request for zoning verification asks the city to confirm in writing how a property is zoned and whether a proposed use is allowed.
If the project does not comply, there are routes: a variance, a special use permit or a rezoning. These involve hearings and public input, and they take months. Some zoning decisions in Atlanta are noticed to the Neighborhood Planning Units, or NPUs, which are citizen advisory bodies the city uses to review zoning and permit matters. For certain districts, the Special Administrative Permit process requires notification to the relevant NPU. The NPU's role is advisory, and the city's decision-makers hold the final say. This is a frequent source of friction in development debates around the city, and How Atlanta decides what gets built, from NPUs to zoning to permits explores it.
Step 2: Decide what kind of permit you need
Atlanta requires a building permit for most construction work: new buildings, additions, structural changes, and many alterations. Separate trade permits apply to electrical, plumbing and mechanical work, and some projects need more than one. Small cosmetic work, such as painting or replacing flooring, generally does not, but the rule depends on the scope, and the Office of Buildings can confirm. A good approach is to ask first. Calling or visiting costs nothing and avoids a stop-work order later.
Commercial projects, including a new restaurant buildout or a tenant space in an older building, need permits and inspections as well, and often a separate review for the business. How to start a business in Atlanta: licenses, taxes and the ATLCORE portal describes the business license side.
Step 3: Apply and respond to review
Applications are submitted through the city's permitting system. The city's online portal handles applications and plan review for many permit types, and the Office of Buildings can help with those that are handled in person. A typical application includes:
- a completed application form,
- a site plan or survey showing where the work sits on the lot,
- construction drawings for work that needs them,
- contractor information, since Georgia requires licensed contractors for some trades, and
- the property owner's information.
City staff review the plans for code compliance. If they find problems, the application is returned with comments, and you respond with revised drawings. That back-and-forth is normal, and it is the main reason timelines vary. Complete applications with clear drawings move faster.
When approved, the permit is issued and the fee is paid. Post the permit at the site if the permit says so, because inspectors look for it.
Step 4: Inspections
Permitted work is inspected at stages, such as foundation, framing, rough-in of the trades and final. You or your contractor schedule each inspection, and the work must pass before the next stage proceeds. A final inspection closes the permit and, for new construction, leads to a certificate of occupancy before the building can be used.
Skipping inspections can cause real trouble. Unpermitted work can surface when you sell the house, since a buyer's inspector or lender may ask for the permits, and it can lead to code enforcement and penalties. When the work was done before you bought the house, ask the Office of Buildings what the record shows.
Tree removal
Atlanta calls itself the City in a Forest, and it takes its trees seriously. A tree-protection ordinance has been in force since 1993, and removing certain trees requires a permit from the city. The rules turn on the size and type of tree, whether the tree is on private land, and whether it is dead, dying or hazardous. Removal can carry requirements to replace trees or pay into a fund. The details are in the ordinance and on the city's tree pages, and the Office of Buildings handles permits for tree removal.
The practical advice is simple: do not cut a large tree, even in your own yard, until you have checked with the city. Fines for illegal removal can be substantial, and neighbors do report them. If a tree has fallen or is an immediate danger, report it through ATL311 or 911 as the situation warrants; How to report a problem to ATL311 explains ATL311.
Neighborhood overlays and historic districts
Some Atlanta neighborhoods carry extra rules. Historic districts, for example, can require design review before exterior changes, and some commercial corridors have special zoning. A homeowner in a place such as Virginia-Highland, known for its dense bungalow streets, or a builder in West Midtown, where old industrial buildings have been converted, may meet different requirements from someone building in a district with standard zoning. Virginia-Highland and West Midtown describe those areas. Ask at the start whether any overlay applies.
If you are hiring a contractor
- Ask for the contractor's state license where one is required, and ask who pulls the permit. The person who pulls it takes responsibility for the work.
- Confirm that the contract names the permits and inspections.
- Be wary of a contractor who suggests skipping the permit to save time.
What to expect on timing and cost
Timelines depend on the project, from simple over-the-counter permits to complex plan reviews that take weeks or longer. Fees depend on the work, and the department publishes its schedule. Neither is a figure this guide can give, so check the city's page.
The city's zoning, development and permitting services page is the starting point for forms and contacts.