Blog
The Eastside Trail: a walk along the Beltline from Piedmont Park to Reynoldstown
Walk the Beltline's east side past Old Fourth Ward, Inman Park and Reynoldstown, with the freight corridor's story and the 2005 $2.8 billion approval.
Start at the edge of Piedmont Park and head south. The lawns give way to a paved trail with trees on both sides, and before long you are walking past old industrial buildings that now hold homes and shops, crossing streets by bridge or underpass, on the level bed of a railroad. The freight line that once served the factories of the east side is gone. Its right-of-way is the path under your feet.
This is the Eastside Trail of the Atlanta Beltline, the stretch of the 22-mile loop that most people mean when they say "the Beltline." The walk here runs north to south, from Piedmont Park through Old Fourth Ward and Inman Park to Reynoldstown, and along the way it explains how a rail corridor became the most-used public path in the city.
Where the trail came from
The Beltline began as a student's idea. Ryan Gravel, then a graduate student at Georgia Tech, proposed in a 1999 master's thesis that the rail corridors encircling central Atlanta could carry transit and shape development. The Atlanta City Council adopted a Beltline redevelopment plan in 2005, and the city approved the project at a cost the plan put at $2.8 billion. The nonprofit Atlanta Beltline Partnership was formed in 2005, and Atlanta Beltline, Inc., the city-affiliated organization that builds the loop, followed in 2006. The finished loop is about 22 miles long, running through a former railway corridor around the central city.
The money came through a tax allocation district, in which growth in property tax revenue inside a designated area pays for the improvements. Tax allocation districts, explained: the tool behind Atlanta's big projects explains how that works. The loop's financing, its housing promises and its rail plans are covered in The Beltline from idea to 2030: a timeline. This piece sticks to the part you can walk.
Piedmont Park and the 10th Street gate
The trail's northern end is at Piedmont Park, the 189-acre park whose history is told in Piedmont Park: Atlanta's front yard. From there the Eastside Trail leads south toward Inman Park. Atlanta's first protected bike track, which opened on 10th Street in Midtown in 2012, is nearby, and anyone who has biked the area will link the two (see From a bike track to a bike share: cycling in Atlanta since 2009).
The walk starts at the park for a simple reason: that is where the trail's users come from. Piedmont Park draws runners, strollers and cyclists in large numbers, and plenty of them step off its lawns and onto the trail.
Old Fourth Ward
South of the park the trail runs through Old Fourth Ward, a neighborhood east of Downtown with a heavy history. On May 21, 1917, a fire destroyed 1,938 buildings in what is now the Old Fourth Ward. One person died and about 10,000 were left homeless. The neighborhood is also home to Dr. Martin Luther King Jr.'s birthplace, which stands here and belongs to the national historical park described in What the Martin Luther King Jr. National Historical Park contains. Old Fourth Ward after the 1917 fire tells the story of the fire and what rose in its place.
What most people see from the trail is Historic Fourth Ward Park, which covers 63 acres, according to published sources, with a retention pond, a skate park and green space. Its design does double duty, as a recreational park and as a stormwater facility. A large building nearby, a former Sears, Roebuck warehouse, has been converted into a mixed-use complex and is one of the trail's best-known landmarks. Neighborhood details are in Old Fourth Ward.
Inman Park
Keep going south and east and you are in Inman Park, Atlanta's first planned suburb. Joel Hurt, the developer, planned it in the late 1880s and tied it to Downtown with one of the city's first electric streetcar lines, along Edgewood Avenue. Its curving streets and its Queen Anne, Italianate and Romanesque houses make it one of the best-preserved Victorian neighborhoods in the Southeast. Inman Park, Atlanta's first planned suburb tells the neighborhood's own story, and Inman Park is its profile.
On the trail, Inman Park is where the east side's industrial past shows most plainly. Former industrial sites along the corridor have become housing, shops and a food market. A tunnel under the railroad, known as the Krog Street Tunnel, is covered in street art. The trail forms Inman Park's western boundary. Freedom Parkway marks its northern edge, with Poncey-Highland beyond, and Moreland Avenue is its eastern edge, past which lie Candler Park and Little Five Points.
A MARTA rail station, Inman Park/Reynoldstown, sits at the south end of the neighborhood, so you can ride in or out on the train. That makes this one of the few segments of the trail that is easy to do as a one-way walk.
Reynoldstown
South of Inman Park the trail enters Reynoldstown, a neighborhood that sits beside the trail and beside the MARTA station that shares its name. Reynoldstown is also where the east side meets the Southeast Trail, which connects the Eastside and Southside trails through the neighborhood. As of 2026 that southeastern connection and the segments beyond it are being completed, and The Southeast Trail opens: Boulevard to Glenwood Avenue follows the loop's progress. See Reynoldstown for the neighborhood.
What the trail did to the neighborhood
The Eastside Trail has changed its neighborhoods in ways that can be measured and in ways people argue over. Property values along it have risen, new apartment buildings have gone up, and the trail has become a destination in its own right. One measure the project cites is private investment. Published accounts say cumulative private investment inside the Beltline's tax allocation district had reached $14.2 billion by 2026, against an original target of $10 billion. Those are the project's own figures.
The other side of the ledger is housing. The state-mandated goal is to create or preserve 5,600 affordable units by 2030. By mid-2026 the project reported about four-fifths of that goal, 4,425 units in its district at one count. Whether the pace of affordable housing has kept up with the rise in prices is something supporters and critics disagree about, and the facts and arguments are in The Beltline and housing affordability: what was promised, built and criticized.
The rail that has not come
The Beltline was conceived as a transit project, and the original thesis imagined a loop of light rail. Voters approved the More MARTA sales tax in 2016, providing $1.3 billion for transit expansion, and plans for Beltline-adjacent rail have been through several versions. In March 2025 the mayor withdrew support for starting Beltline rail on the Eastside Trail, a decision that reprioritized streetcar work elsewhere. For now, then, the Eastside Trail is a path for walking and cycling, not a rail line, and a rider who wants transit between Midtown and Inman Park takes MARTA's heavy rail or a bus. The debate over how and whether to add rail to the Eastside is still part of the public conversation, and this article takes no side.
The Beltline in dates
| Year | What happened |
|---|---|
| 1999 | Ryan Gravel's Georgia Tech thesis proposes the loop |
| 2005 | City Council adopts the redevelopment plan; the city approves the $2.8 billion project; the Beltline Partnership forms |
| 2006 | Atlanta Beltline, Inc. is formed |
| 2008 | The 2.4-mile West End Trail opens |
| 2010 | The first Northside section opens |
| 2016 | Voters approve the More MARTA sales tax, with $1.3 billion for transit expansion |
| September 2017 | The 3.2-mile Westside Trail opens |
| March 2025 | The mayor withdraws support for starting rail on the Eastside Trail |
| April 2026 | The Southeast Trail opens, Boulevard to Glenwood Avenue |
| June 2026 | Nearly 17 continuous miles, known as "The U," are complete |
| October 27, 2026 | Ground is broken on a Northwest Trail section in Buckhead |
| 2030 | Target for the full 22-mile loop and several miles of spurs |
The loop has gone up in pieces, in different places, and the table shows the West End and Northside sections came early. The Eastside Trail's fame owes more to where it runs, between a major park, two historic neighborhoods and a dense stretch of the east side, than to being first.
Questions before you go
Is it a loop yet? No. About 16.7 of the 22 miles of mainline were open as of late October 2026, and the project's own target for the whole loop is 2030. The remaining pieces are described in The Northwest Trail and the last gap in the Beltline loop.
Can I take a train from one end to the other? Not on the Beltline itself, because the trail is not a rail line. MARTA's Inman Park/Reynoldstown station is at the trail's southern end.
Is it only for walking? No. Cyclists and scooter riders use it, and the shared-use rules apply to everyone. See the guide on using it.
Who runs it? Atlanta Beltline, Inc., a nonprofit that works with the city. See Atlanta Beltline, Inc..
Walking it
For a first-timer, a sensible plan is to do the trail from north to south, ride the train back and take as long as you like.
- Start at the park gate nearest the trail. Check the conservancy's or Beltline's own map for gate locations.
- Walk south past Old Fourth Ward, noting the park and the large former warehouse.
- Cross into Inman Park, stopping at the tunnel with its street art.
- Finish at the Inman Park/Reynoldstown station, where MARTA rail can take you back toward Midtown or Downtown.
Walkers, runners, cyclists and scooter riders all share the trail, and it is popular enough that manners matter. The etiquette and the rules for bikes and scooters are in Using the Beltline on foot and by bike and Biking and riding scooters in Atlanta after Relay. Atlanta Beltline, Inc. posts trail hours, closures and construction notices at beltline.org.
As of late October 2026, about 16.7 miles of the 22-mile mainline were open, with full completion targeted for 2030. The Eastside Trail is the best known piece, and the one that shows most clearly what the project set out to do: take a corridor built to move freight out of a city and make it a way of moving through the city, on foot, one block at a time.