Guides

Using the Beltline on foot and by bike

About 16.7 of the Beltline's 22 miles were open in late October 2026. Which segments exist, how to reach them, and where to check rules before you go.

By late October 2026, about 16.7 miles of the 22-mile Atlanta Beltline loop was open as continuous mainline trail. The rest is still being built, with full completion targeted for 2030. That gap matters for planning: the Beltline is not yet a loop you can ride around, but it is already the longest car-free route in the city, and several of its segments are good for a first visit by foot or bike.

The Beltline follows a former freight railroad corridor around the core of the city. The city approved the project, at a cost then stated as $2.8 billion, in 2005, and the nonprofit Atlanta Beltline, Inc. delivers it. The trails sit beside a growing list of parks and, over time, are meant to carry transit too. This guide is about the trails as a place to walk, run and ride.

Which segments are open

The Beltline's own site describes "nearly 17 miles of mainline trail and another 12 miles of connector trails." The segments people use most:

The Eastside Trail. This is the most heavily used stretch. It runs from the Piedmont Park end through the Old Fourth Ward and past Inman Park and Reynoldstown, and it passes Historic Fourth Ward Park, a large city park. If you want to see the Beltline at its busiest, with the trail lined by public art and the old rail bed visible beside it, start here. The neighborhoods it touches are covered in Old Fourth Ward, Inman Park and Reynoldstown.

The Westside Trail. It opened in 2017 on the old rail corridor and is quieter and more residential. On the way it passes close to West End and Adair Park, the latter bordered by the Beltline on one side (Adair Park, West End). Westside parks along the route, such as Maddox Park and Shirley Clarke Franklin Park, are the destinations of some trips.

The Southeast Trail. The newest finished piece as of this writing opened in April 2026: a 1.2-mile stretch from Boulevard to Glenwood Avenue, linking earlier segments on the east and south sides.

The Northside and Southwest trails. Shorter early segments exist on the northside near Tanyard Creek and in the southwest, and a spur is planned to extend the southwest connection. If you are looking for the continuous mainline, the Eastside, Southeast and Westside segments are the main reference points.

The Northwest Trail is next. Ground was broken on a section in Buckhead on October 27, 2026. The full Northwest Trail will run 4.3 miles from Blandtown to the Lindbergh and Morosgo neighborhoods. Beltline, Inc. says it has the land for the entire loop. An earlier public goal of 17.9 miles by the 2026 World Cup was missed; the figure that was reached in October was 16.7.

Getting on and off

Access points are scattered along the trail, usually at street crossings and at parks. The Beltline's interactive map, linked from its site, is the place to see current access points, connector trails and closures; the segments are different in character, so look at the map before you choose a starting point.

Two practical points follow from the way the trail was built:

  • Rail bed, not street. On most segments the trail runs on or beside the old rail bed, which means it crosses streets at grade or goes over and under them. Slow down at crossings.
  • MARTA as a trailhead. MARTA's Inman Park station is near the Eastside Trail, and stations on the west and south lines, such as West End, sit near the Westside and southwest segments; the Beltline map shows which station is closest to which access point. Taking a train out and the trail back (or the reverse) is a good way to avoid parking.

For a short first visit on foot, the Eastside Trail from Piedmont Park to Inman Park is a good option because of the number of parks and neighborhoods on it. For a longer bike ride, link the Eastside, Southeast and Westside segments, and plan for the fact that some links are street-level connectors rather than separated trail. Biking and riding scooters in Atlanta after Relay explains how the bike-share and scooter rules work in the city if you arrive without a bike.

Hours, rules and etiquette: check the source

Trail hours, rules on e-bikes and scooters, dogs, and who yields to whom are set by Beltline, Inc. and the City, and they can change. The Beltline site has a Visitor Information page with a trail-etiquette section and an FAQ that covers passing, right-of-way between walkers and cyclists, and what to do if someone is behaving dangerously. Read those before your first ride rather than relying on a summary. Rules for shared e-scooters and e-bikes also come from the city's Department of Transportation, covered in Biking and riding scooters in Atlanta after Relay.

Two other things worth knowing:

  • Construction and closures. Because the trail is still being built, a detour or a short closure is possible at any time. The map and the Beltline's website carry current notices.
  • Parks are separate from trail. Park reservations are made through the City, not through Beltline, Inc., according to the Beltline's own site.

How the rest will get built

The remaining miles are largely in the north and west. After the Northwest Trail from Blandtown to Lindbergh, the loop's last gaps are closed, with 2030 the stated target for full completion. The story of how the idea became a funded project is told in The Beltline from idea to 2030: a timeline, and the walk along its busiest stretch is in The Eastside Trail: a walk along the Beltline from Piedmont Park to Reynoldstown.

For official information and the current map, start at beltline.org.

Related city government

Related neighborhoods

Latest on this topic