Install
Trails and Greenways blog
Myths about the Beltline: it is not finished and it is not only a trail What the Beltline is and is not: 16.7 of 22 miles open as of late October 2026, a 2030 target, a missed World Cup promise, and the transit and housing debates. The Beltline as a park system: trail miles and the green it adds Beyond the trail, the Atlanta Beltline was planned as 1,300 acres of greenspace and 33 miles of paths; what is open in 2026, what remains and who builds it. The Beltline from idea to 2030: a timeline From a 1999 graduate thesis to 16.7 of 22 miles open in 2026: the money, the missed 2024 target, the housing promise, and what critics say. The Eastside Trail: a walk along the Beltline from Piedmont Park to Reynoldstown Walk the Beltline's east side past Old Fourth Ward, Inman Park and Reynoldstown, with the freight corridor's story and the 2005 $2.8 billion approval. The Northwest Trail and the last gap in the Beltline loop The 4.3-mile Northwest Trail, from Blandtown to Lindbergh/Morosgo, is the last big piece of the Beltline. The land is bought and 2030 is the target. The Southeast Trail opens: Boulevard to Glenwood Avenue A 1.2-mile Beltline link opened in April 2026. What it joins, and what the 17.9-mile World Cup promise looks like against the 16.7 miles delivered. The Westside and Southwest trails: a Beltline walk through West End and Adair Park The Beltline's west side links the West End and Adair Park to the rest of a U-shaped run of nearly 17 continuous miles. What is there, and what it passes.