Ask an Atlantan about traffic and the answer will almost always come down to one stretch of pavement. It is only about seven and a half miles long. But it is where Interstate 75 and Interstate 85 merge and share a roadbed through the middle of the city, and it carries a share of the region's traffic out of all proportion to its length. Call it the Downtown Connector, or just "the Connector," and people plan their days around it, sometimes their whole lives.
A commonly quoted figure puts its daily traffic at more than 340,000 vehicles. Published counts shift with the spot and the year. At its lightest, just south of Fulton Street, the Connector has been measured at about 243,000 vehicles a day. At its busiest, just south of 10th Street, the count tops 437,000. The 340,000 figure sits comfortably in between, and it is best read as a rough average for a road that is never quiet.
What the road is
The Connector is the concurrent section of I-75 and I-85 through Downtown Atlanta, running generally north. Its south end is the I-85 and Langford Parkway interchange, exit 242, where the concurrency begins. It meets I-20 near the middle, at exit 247, and just north of that interchange comes the Grady Curve, named for Grady Memorial Hospital beside it. The north end is the Brookwood Interchange, also called the Brookwood Split, in Midtown, where the two interstates go their separate ways. Exit numbers follow I-75's mileposts, from 242 to 251B. One description gives the length as 7.4 miles and another as about 7.5.
Since the 2000s most of the roadway has carried an official name, James Wendell George Parkway, though nobody on a car radio says it. The road also carries two unsigned state designations, State Route 401 for the I-75 side and State Route 403 for I-85. Atlanta's other major interstates are I-20, which crosses the Connector, and I-285, the Perimeter, which rings the region. Inside and outside the Perimeter: what ITP and OTP mean has more on that.
The engineering has a few distinctive touches. HOV lanes were built during the 1980s reconstruction and converted to HOV use in 1996. More than 25 closed-circuit cameras cover the stretch between the Langford and Brookwood interchanges. Three large overhead electronic message signs and four smaller ones for the HOV lanes keep drivers informed, and virtually all of the entrance ramps are metered, except for the freeway-to-freeway connections at I-20.
Drawn on paper in 1944
The Connector's history starts with a plan. In December 1944 the state highway department, the city, Fulton County and the federal Bureau of Public Roads agreed on a scheme to improve traffic in Atlanta. A January 1946 report recommended six radiating expressways, four of which would converge into what became the Downtown Connector.
Construction came in stages.
- September 25, 1951: the first section opens, between Williams Street and Brookwood.
- July 25, 1957: a southern section opens.
- 1959 and 1964: further sections open.
- September 18, 1964: the final stretch, including the I-20 interchange, opens, with a ribbon-cutting on October 15, 1964.
Those years overlap with the annexation of Buckhead in 1952 (see buckhead and the 1952 annexation: how the uptown district joined the city) and with the desegregation of Atlanta's public spaces, described in "The city too busy to hate" and its limits: desegregation, 1959 to 1973. The road was one more big public project in a city busy remaking itself.
Who paid for the road
Early construction displaced parts of Techwood Drive and Williams Street, cut through Sweet Auburn and leveled part of the Washington-Rawson neighborhood. Sweet Auburn had been the center of Black commerce in the city since the early twentieth century, so the division of Auburn Avenue by the road is a significant part of the Connector's legacy. The story is in Sweet Auburn Avenue, a walk through Black Atlanta's main street and Sweet Auburn: Black commerce in the age of Jim Crow. The nearby Techwood area was the site of the nation's first federal housing project, which appears in Techwood Homes: the nation's first federal housing project, 1935.
The roads the city never built belong to the story too, the freeways that residents fought off. The two freeways Atlanta never built: the 1975 eastside revolt tells that history. Inman Park's fight against a planned freeway, in Inman Park, Atlanta's first planned suburb, is a related case.
Freeing the Freeways, 1976 to 1989
By the 1970s the Connector was overloaded, and the state launched a reconstruction program called Freeing the Freeways. Phased from 1976 to 1989, it widened most of the Connector from three lanes in each direction to six or seven. The same program widened the Perimeter to eight lanes. The final section of the Connector reconstruction opened on May 15, 1989. What it left behind is the broad, often crowded roadbed Atlantans know today.
The bridges, the ice and the studies
The road has been the subject of other projects.
- The 17th Street Bridge, built between 2000 and 2004, reconnected Midtown with the west side and Atlantic Station across the roadway.
- The 14th Street Bridge, reconstructed in 2008, with the work completed on May 28, 2010.
- A January 2010 episode of "phantom ice" between 14th and 17th streets brought brief traffic stops on the stretch.
- A 2016 study by the state transportation department examined congestion on the Connector.
Putting a lid on it
A more ambitious set of ideas imagines covering parts of the Connector with parks. In 2016 Central Atlanta Progress, the downtown business organization, proposed capping parts of the road with green space over about 14 acres. The proposal became known as The Stitch, a reference to sewing back together the neighborhoods the road separated. A 2019 Urban Land Institute study put the cost at $452 million. In 2021 a proposal called the Midtown Connector Project suggested a park over ten blocks in Midtown, from North Avenue to 10th Street. As far as the published record shows, none of these has been built. For current status, look to the sponsors' own announcements.
The Connector in dates
| Year | What happened |
|---|---|
| December 1944 | State, city, county and federal agencies agree on a traffic plan |
| January 1946 | A report recommends six radiating expressways, four converging on the Connector |
| September 25, 1951 | First section opens, Williams Street to Brookwood |
| July 25, 1957 | A southern section opens |
| September 18, 1964 | The final stretch, with the I-20 interchange, opens |
| 1976 to 1989 | Reconstruction under Freeing the Freeways; last section opens May 15, 1989 |
| 1996 | HOV lanes are converted to HOV use |
| 2000 to 2004 | The 17th Street Bridge is built |
| May 28, 2010 | Reconstruction of the 14th Street Bridge is completed |
| 2016 and 2019 | The capping proposal and its cost study |
| 2021 | The Midtown Connector Project proposal |
Back-of-the-envelope traffic
The published numbers invite a little arithmetic. Take the busiest count, more than 437,000 vehicles a day south of 10th Street, and the lightest, about 243,000 south of Fulton Street. The busiest spot carries about 80 percent more traffic than the lightest, since 437,000 divided by 243,000 is about 1.8. So "the Connector's traffic" is not one number. The road takes on and sheds vehicles at its many ramps, and the load changes from block to block.
Now a hypothetical. If the road averaged 340,000 vehicles a day over its 7.4 miles, and each vehicle drove the whole length, that would come to 340,000 times 7.4, or about 2.5 million vehicle-miles every day on this one stretch. The real figure differs, because many vehicles get on or off partway, and the example is only meant to give a sense of scale. At that volume a single ramp meter or a single stalled car matters, which is why the cameras and message signs exist and why drivers check conditions before they leave.
How Atlantans live with it
Locals have a repertoire of habits for dealing with the Connector.
- Check conditions before leaving. Georgia's official 511 traffic service, at 511ga.org, shows incidents and camera views. The Connector's camera network exists for exactly this purpose.
- Avoid the busiest hours. Rush hours are the worst. The stretch just south of 10th Street has the highest published count, so a trip that can skip it gains the most.
- Know the alternatives. MARTA's rail network offers a car-free alternative for many trips, and the streets of Downtown and Midtown are an option for short ones. See Getting around Atlanta without a car.
- Use the Perimeter wisely. A trip that does not need Downtown can often go around it on I-285, though the Perimeter has its own problems. See Driving in Atlanta: the interstates, the Connector and the Perimeter.
- Leave room for events. Stadium and arena events add traffic near the Connector's exits, and Getting to stadium and arena events by MARTA explains how to avoid driving to them.
For a larger sense of how the highway sits among the districts it serves, Atlanta's three skylines: Downtown, Midtown and Buckhead compared places the Connector among them.
Three hundred forty thousand, one at a time
The Connector is described as among the ten most congested interstate stretches in the country, and its published counts run from about a quarter of a million to more than 437,000 vehicles a day. Behind each one is a person, or several, with somewhere to be. The road's reliability, or its lack, eats hours of life every week.
The history shows the road was a choice, made on paper in 1944 and carried out over two decades. The proposals to cap parts of it show that people still treat that choice as open to revision. Next time you are stopped on the Connector, it helps to know that someone decided where this road would go, and that the neighborhoods in its path paid for the decision.